Table 2: Seven minute peak demand period usage
OutletsFlow rateTotal usageBathrooms in home
GPMGallons11.52-2.53-4
Shower or bath tub53535355370
Lavatory422468
Toilet455101520
Kitchen sink533333
Automatic washer535-181818
Dishwasher214--33
Normal seven minute peak demand (gallons)45709812
Minimum sized pump to meet peak demand7 GPM10 GPM14 GPM17 GMP
without supplemental supply(420 GPH)(600 GPH)(840 GPH)(1020 GPH)

Note: Values given are average and do not include higher or lower extremes. *Peak demand can occur several times during morning and evening hours. Additional requirements: Farm, irrigation and sprinkling are shown in part 3 of this section. These values must be added to the peak demand figures if usage will occur during normal demand periods.

In order for the system to operate satisfactorily, the proper compressed air-to-water ratio must be maintained. Since air is soluble in water, the air charge in a plain tank must be constantly replenished by some type of air volume control as in “A”, Fig. 2, or the compressed air must be separated from the water as shown in “B”, “C”, “D”. The Wafer, “B”, floats up and down on the water and, thus reduces air-to-water contact area, while the Diaphragm, “C”, and Bladder, “D”, hermetically seal the air from the water.  Diaphragm and Bladder type tanks are pre-charged with air at the factory. An air charging valve is provided in these types of tanks to allow the installer to change the pre-charge pressure. Pre-charging a tank increases the amount of water that can be withdrawn between operating cycles of the pump. To select the proper pressure tank, follow the instructions below.

  1. Determine the peak demand for a seven minute period, which is the average time of higher water usage by such devices as automatic washers and showers. The Peak Demand is found by reading down the column in Table 2 under the number of bathrooms. For example, the Peak Demand for a home with 1½ bathrooms is 70 gallons.
  2. Follow the same column down to the “Minimum sized pump requirement”, which is 10GPM, or 600 GPH for the 1½ bathroom example.
  3. Check to make sure the well and the pump selected have sufficient capacity to meet or exceed the Peak Demand rate. If they do not, go to Step 4. If they do have sufficient capacity, select the tank from Table 3. Continuing with our 10 GPM example and assuming a pressure switch setting of 30 – 50 lbs per in2, it is found that an 80 gallon Plain steel tank would be required, compared to only a 45 gallon size in the Wafer type or 40 gallon for the bladder or diaphragm types. For farms or other installations requiring water in addition to household use, the extra gallons needed during the seven minute Peak Demand period must be estimated using Table 2. The additional gallons are then added to the amount found in Table 2, above. For instance, if the 1½ bathroom house, in the example above, had as estimated increase usage of 35 gallons during the peak demand period, the total water needed during the period would be 35+70 or 105 gallons. Divide 105 by 7 to get the use rate of 15 gallons per minute. Enter Table 3, for 30 – 50 lbs per in2 pressure, to find the tank size required, which is 150 gallon Plain steel, 80 gallon Wafer, or 75 gallon Bladder or Diaphragm types. If a standard tank is not available in the indicated size use the nest larger standard size.
  4. If the well and pump do not have the capacity to meet the Peak Demand, an extra large pressure tank, or a 2-pump system may be necessary. In a 2-pump system, the well pump pumps into a storage tank at a rate which does not exceed the well capacity. This pump is controlled by a switch actuated by water level in the storage tank. A second pump, of the centrifugal “booster” type, pumps from the storage tank to the pressure tank. It is actuated by a pressure switch. Consult your representative on specific installations requiring supplemental water storage.
PumpCapacityMinimumSwitch setting (Pounds per square inch)
PGHGPMDrawdown20-4040-6030-50
ABCABCABC
(Gals)
24044201515302015402020
24044201515302015402020
30055302015402520502525
36066352020452525553030
42077102520553025754030
48088403025653530854535
54099503030704035955040
60010105535308045401055545
66011126040359550451256555
720121370454010560501357060
780131580504512065601558070
840141790605513575651759075
90015191006560150807519510585
96016201107065160907520511595
10201723120807018510090240125105
10801825135858020011095260140115
114019271509585215120105280150125
1200203016010595240130115310165140
14002133175115105265140125340180150
13202236190120110290155140370190160
13802338205130120305165145390205175
14402441220140130330175150425225185
15002544235150140350190170455225185
15602647250160145375205180485260215
16202750270175155400230190515275230
16802853285185165425230205550290240
17402957305195175460245220590310260
18003060320205190480260230620330275